Aughnagun Landfill Site, Capping Phase 3

This project involved the fully engineered capping of approx. 18,000m² of the Phase 3 area of the existing Aughnagun landfill site, together with associated surface water drainage.

Works included:

  • Earthworks
  • Engineered Landfill Capping Works, including installing GCL Impermeable Liner and Gas & Drainage Geocomposites
  • Drainage
  • Gas extraction infrastructure
  • Leachate collection & pumping infrastructure amendments
  • Landscaping