Projects Quarry
Products
Concrete
Blocks
Residential
Surfacing
Commercial
Surfacing
Plant
Hire
Civil
Engineering
News Careers Contact
North Down Coastal Path Improvements at Seahill
North Down Coastal Path Improvements at Seahill

The project comprised the Design and Build of a new DDA compliant bitmac coastal path and elevated walkway along a 200m length of the North Down Coastal Path at Seahill, Cultra, Co. Down.

Works included:

  • Site Clearance, including demolition of existing clifftop walkway on completion
  • Earthworks, including rock cutting of cliff to form path shelf
  • Auger boring and placing steel tubular piles to support elevated walkway
  • Erection of 1.8m wide elevated walkway
  • Reinforced concrete bank seats and retaining wall to support coastal path
  • Guard rails
  • Drainage
  • Rock Armour
  • Works completed in tidal conditions
  • Works were completed adjacent to designated Belfast Lough ASSI & SAC, with auger boring and placement of steel tubular piles monitored and controlled by Marine Mammal Observer