Phase 2 Works James Park

Gibson’s have recently been awarded Phase 2 Works James Park, on behalf of Turkington Construction. The project will provide a circa 17,000m² car park with provision for future EV charging. The scope of work includes:

  • Stormwater collection system – (including 1800mm diameter attenuation pipework SUDS)
  • Mechanical and electrical siteworks
  • Bulk earthworks
  • Pavement construction
  • Reinforced concrete and formwork
  • SMA Surfacing
  • Contractor designed retention structure